Draft Beer System Upgrade Custom Tower available, just show us your design and let us build the tower that's just right for your business. Contract for Installation of Parts and Labor This agreement is entered into in South Houston, Texas made between ___________________ (hereafter called “Client”) located at address: _______________________________ and Carbonics, INC. (hereafter called “Carbonics”) located at 506 Nebraska St, South Houston, Texas 77587. Carbonics agrees to provide parts and labor based on the following terms and conditions:
|
Author: sam@carbonics.com |
Columnar Drain Trays | $220 each for the drain trays. | |
Juliette 3 or 5 Glycol or Air cooled 17 1/8" height, faucet height 13" $1794 3-faucet non-LED 15 5/16" width $2220 3-faucet with LED medallions $2250 5-faucet non-LED 24 11/16" width $2952 5-faucet with LED (as pictured) | I think this tower would look nicest. You'll have to picture it without the LED medallions that are on this example. You can always go with one of the other towers that I included here to give you options, but this one is the coolest looking tower, that would seem to fit with a Tommy Bahama's better than these other uninspiring towers. Your choice though. of course. $2250 for the 5-faucet non-led version ( X 2 towers) | |
Faucets Faucets can come in Stainless Steel, 304 Grade Stainless (for wine), or in chrome plated Brass for extra economy. | The Juliette comes with the upgraded Stainless Steel faucets pictured here. (the other towers come with the economy chrome-plated brass faucets) | |
Beer Systems Hardware Author: Sam This is the backbone of your Draft Beer System. A Carbonics Inc installed system is guaranteed to pour a perfect beer! Listed below you can find some of the equipment (and cost) available to build your cost saving Draft Beer System: |
If your gas blend is not right you will have eiher flat beer or foamy beer. Both of which cost you income! | Carbonics Draft Beer Equipment Purchase or Lease your equipment (see bottom for lease info) and Carbonics, Inc. guarantees a perfect pour for every line, saving you $$ on loss of product. No wasted foam, no overpours, no waiting for the beer to "settle". Talk to us about your equipment options: 713-944-7900 | Colder beer loses all taste. Warmer beer is unpleasant and more likely to foam! |
Wall Panel - Long (pumps) Good for any length of run. $285.00 - 1 product $445.00 - 2 product $598.00 - 3 product $748.00 - 4 product +$70 each to upgrade FOB to Core Component (SS & Glass) | $1043 1 2-product and 1 3-product panel + $350 to upgrade to the Core Component Glass and Stainless Steel FOBS | |
FOB short plastic $70.55 Requires 2 sets of tail-piece assemblies. 1/4 drain lines ($10 per FOB) Turn black knob on top counter clockwise until knob "pops" up allowing float to rise. Turn knob clockwise, to lock it down for normal operation. | ||
FOB Glass and SS Glass and Stainless Steel $134.95 Requires 2 sets of tail-piece assemblies 1/4 drain lines ($10 per FOB) | ||
Insulated Trunk Line Gen-X Latest technology with gas barrier and outstanding hygienic quality. No loss of co2 through tubing walls. 4-prod 2-gly $14.00/ft 6-prod 2-gly $14.35/ft 8-prod 2-gly $16.35/ft 10-prod 2-gly $19.15/ft 10-prod 4-gly $19.00/ft 12-prod 4-gly $20.75/ft | I measured 55' to the first tower and 15' more to the 2nd tower. Then I need to allow for the vertical drop down into the pipe, and coming back up.. so we need 75' of trunk to make sure we're going to make it all the way to tower two. 75 X $14.35 = $1076.25 | |
Keg Shelves top shelf hold 15 lbs / square foot 1 3/4" square tubing (adjustable shelves) 1 5/16" round heavy wall tubing posts 76" height, 20" depth 10 keg - $1026 - 93" L X 76" H X 20" depth 8 keg - $775 - 80" L X 68" H X 17" depth | ||
Keg Dolly | ||
Miscellaneous Parts There are hundreds of fittings, clamps, brackets, ties, splicers, adapters, types of tapes, types of insulation, sealers, gap fillers, etc that are used in every installation. *Pricing for estimates or quotes is an educated estimate, not an exact figure unless specified as "flat fee." Not having product, power & water at the time of installation will result in additional trip charges. Estimated installation does not include electrical, plumbing, tubing chase core drilling, or cutting of specialty countertops. No installation work will begin if a responsible party (decision maker) is not available on site. End user is responsible for adequate ventilation & air circulation of all air cooled equipment per manufacturer's specifications. | I estimate $100 worth of splicers, clamps, tape, extra insulation, fittings, etc. | |
Labor We guarantee our work and provide free training for your staff. Our crews are bonded, certified Draft Beer Specialists who received continuing education to insure they remain on the cutting edge of Draft technology and practices. Our Draft Specialists will insure your system operates efficiently, saving you money on loss and making for happy customers. | pulling the existing trunkline running new trunk line removing existing panel installing new panel removing existing towers installing new towers 2 man crew 6.5 hours $910 during business hours $1800 for overnight | |
Date of Agreement:
Client's Representative:
___________________________________.
(Printed Name)
___________________________________.
(Signature)
___________________________________.
(Title)
Carbonic's Representative:
Sam Herren .
(Printed Name)
___________________________________.